01Space & layout
Begin with how the cabin will be used. A guest suite, a garden workspace, and a resort reception each need a different plan.
- External footprint and usable internal area
- Bedrooms, bathrooms, and service zones
- Door positions, access, and deck layout
02Materials & comfort
Match the complete building specification to its setting. Review the wall, roof, floor, windows, and ventilation together.
- Timber species, grade, and cladding finish
- Insulation build-up and glazing specification
- Local climate, ventilation, and heating needs
03Supply & installation
Agree where the factory's scope ends and site work begins. Prepare the people, equipment, and documents needed for arrival.
- Kit, panelised, or assembled supply format
- Packing, unloading, and access requirements
- Foundations and installer responsibilities